Solar GuidesPanel removal and reinstallation
Taking panels off for a reroof, and putting them back properly
If your roof needs replacing and there are already panels on it, the panels have to come off and go back. It is routine work, but it is not free — which is the argument for doing the roof first if you have the choice.
Ranked #5 in the country for residential solar by Solar Power World, 2026. See our awards and credentials
Panels can be removed and refitted, and it is a normal job — but it is not free. It is a real cost, on top of the roof work, and it is the reason the order matters: if an assessment finds the roof needs replacing within the working life of an array, doing the roof first avoids paying for the removal and refit later. Whether that works out cheaper for a particular home depends on the two quotes and on what the assessment finds, and this page does not publish a cost comparison.
What does removing and reinstalling solar panels involve?
The array is de-energized and disconnected, panels and racking come off and are stored on site, the roof is replaced, and then the system is remounted, rewired and recommissioned. The recommissioning matters: a system that goes back up without being properly tested can under-produce for years without anyone noticing.
Why does panel removal and reinstallation cost what it does?
It is not a single trip: the array comes off before the roof work and goes back on after it, with a qualified crew at both ends, plus safe handling of equipment that is expensive and easy to damage. How that is scheduled for a particular home is confirmed when the work is quoted. Anyone quoting it as an afterthought on a roofing bill has probably not priced the electrical work.
How can I avoid paying to remove and reinstall panels?
Replace the roof before the panels go on. A roof that needs replacing before the array does means paying for this job at some point, so settling the roof first removes that cost from the future. Whether doing both together works out cheaper overall is a question for the quotes on your home, not something this page can answer.
What decides this
- Who installed the array. Warranty terms sometimes govern who may touch it.
- Whether the whole array comes off or just a section. Depends on where the roof work is.
- Condition of the mounting hardware. Some of it is not designed to be reused.
- How long the system is down. Production you do not get is part of the cost.
About SunnyMac
2009
the year SunnyMac was founded
3 offices
Marlton NJ, Bethlehem PA and Wilmington DE
4 states
New Jersey, Pennsylvania, Delaware and Maryland
4.6
out of 5 on Google, based on 669 reviews · As of October 6, 2026 · Read our Google reviews (opens in a new tab)
We stay with what we build. SunnyMac is a home electrification, roofing and HVAC company specializing in solar, battery storage, roofing, and heating and cooling, with a mission to make every home we touch more comfortable, more resilient and cheaper to run, proudly serving communities in NJ, PA, MD and DE since 2009.
Also worth reading
Cost and financing
Cash, loan and lease compared honestly.
Roof and solar together
How roof condition can affect solar planning and the order of work.
Battery storage
What battery storage may support during an outage and how stored electricity can be used later.
EV charging
Level 2 charging, what the panel has to support, and what the run to the parking spot costs.
Service for existing systems
Including orphaned systems where the original installer is gone. You do not need to have bought from us.
Installation and project preparation
What installation day, electrical upgrades, meter changes, and site work can involve.
Reading your utility bill after solar
What the numbers mean, and why the bill rarely reaches zero.
How home solar works
Panels, inverter, meter, and what the utility does with the difference.
Solar equipment choices, explained
Microinverters, optimizers and string inverters — what differs.