Learn

Home energy guidance without the sales pitch.

Everything worth understanding before you spend money, written so you could take it to a competitor and still make a good decision.

Illustration: Home energy guidance without the sales pitch.

State and incentive guides

Incentives are set state by state, and in Delaware partly by which utility supplies your power. Each page carries the current position with its source and the date it was checked.

Solar in Delaware

Utility green energy grant, Delaware SREC market.

About 15 weeks from signing to switch-on.

Solar in Maryland

Maryland Solar Access Program, Maryland SREC market.

About 19 weeks from signing to switch-on.

Solar in New Jersey

NJ SuSI program, Sales tax exemption.

About 18 weeks from signing to switch-on.

Solar in Pennsylvania

PA SREC market.

About 19 weeks from signing to switch-on.

Whole-home planning

Which system to deal with first, what can wait, and how one decision changes the next. You do not have to take on everything at once.

Work out what to do first

How a solar project actually runs

End to end it takes about 18 weeks, median, from signing to a system that is legally allowed to switch on (across our installations april 2024 – august 2026). Most of that is not construction. The install itself is usually a day or two; the rest is design, permits and the utility.

  1. Site survey. Someone measures the roof, checks the electrical panel and photographs everything. This is where surprises surface, which is why it happens early.
  2. Design. Panel layout, inverter choice and the electrical plan, drawn to what the survey found rather than to a template.
  3. Permitting. Your municipality reviews the plans. Timelines here are set by the town, not by us, and they vary a lot — this is the single biggest source of variation between two otherwise identical projects.
  4. Installation. The visible part. Usually one to two days on the roof.
  5. Inspection. The town signs off on the work.
  6. Utility interconnection and permission to operate. The utility approves the connection and only then may the system legally produce. Until this step lands, a fully installed system stays switched off — which is why we count "powered" here and not at installation.

See what decides it for your home

Common questions

Do I need a new roof before solar?

Only if the roof is near the end of its life. Panels last decades, so replacing a roof underneath an existing array means paying to remove and reinstall them. Whether yours is close enough to matter is about the life left in it rather than its age, and that is what an assessment establishes.

What happens in a power cut?

Solar alone normally shuts down when the grid goes down, for the safety of line workers. A battery with the right backup equipment can keep selected circuits running. That affects system design, so it is worth discussing before the design is finalized.

Will you service a system someone else installed?

Yes, including orphaned systems where the original installer no longer trades. You do not need to have bought from us.

How long does it take from signing to switching on?

Approximately 18 weeks, median, from signed agreement to permission to operate. Permitting and utility interconnection timelines can vary, so individual project timelines may differ.

Are there still solar incentives?

Yes, at state level, and they differ by state — in Delaware partly by utility. Current values are published on each state page with the date they were verified.

Do I have to talk to a salesperson to get a price?

You can explore what affects solar costs without speaking to a salesperson or providing contact details. A reliable price for your home requires project-specific information, including system design, roof conditions, and electrical requirements.